Technical indicators
Test instructions
Test connection line
Includes an aviation plug (five cores);
The three test line (two thick lines, a thin line);
The three test clamp (a large black clip, a big red clip, a small black clip).
Test connection diagram
◆ the aviation plug is correctly connected to the tester:
The big red clip in the anode, the measured battery black small clip clip clip in large and measured battery anode of a battery anode in the anode black measured battery (or clip to the negative electrode measured battery).
The testing process
◆ open tester, setting of measurement parameters, selection of measurement content;
◆ connected strokes had a U battery, press the pushbutton measurement;
◆ adjustment test clamp is connected to the next of the battery, automatically edit test number tester.
Test instructions
Test connection line
Includes an aviation plug (five cores);
The three test line (two thick lines, a thin line);
The three test clamp (a large black clip, a big red clip, a small black clip).
Test connection diagram
◆ the aviation plug is correctly connected to the tester:
The big red clip in the anode, the measured battery black small clip clip clip in large and measured battery anode of a battery anode in the anode black measured battery (or clip to the negative electrode measured battery).
The testing process
◆ open tester, setting of measurement parameters, selection of measurement content;
◆ connected strokes had a U battery, press the pushbutton measurement;
◆ adjustment test clamp is connected to the next of the battery, automatically edit test number tester.